翻訳と辞書
Words near each other
・ 31st Reconnaissance Squadron
・ 31st Regiment
・ 31st Regiment Kentucky Volunteer Infantry
・ 31st Rescue Squadron
・ 31st Reserve Engineer Company (Ireland)
・ 31st Reserve Field Artillery Regiment (Ireland)
・ 31st Rifle Division
・ 31st Robert Awards
・ 31st Rocket Army
・ 31st Saturn Awards
・ 31st Scripps National Spelling Bee
・ 31st Sports Emmy Awards
・ 31st Squadron (Belgium)
・ 31st SS Volunteer Grenadier Division
・ 31st Street
31st Street Bridge
・ 31st Tactical Air Base
・ 31st Tactical Reconnaissance Squadron
・ 31st Tactical Reconnaissance Training Squadron
・ 31st TCA Awards
・ 31st Test and Evaluation Squadron
・ 31st Tony Awards
・ 31st TVyNovelas Awards
・ 31st U-boat Flotilla
・ 31st United States Congress
・ 31st Vanier Cup
・ 31st Venice International Film Festival
・ 31st Virginia Infantry
・ 31st Wisconsin Volunteer Infantry Regiment
・ 31st World Science Fiction Convention


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

31st Street Bridge : ウィキペディア英語版
31st Street Bridge

The William Raymond Prom Memorial Bridge, commonly known as the 31st Street Bridge, is an arch bridge that carries vehicular traffic across the Allegheny River between the Pittsburgh neighborhoods of Troy Hill and the Strip District. The bridge passes over, but does not serve, Washington's Landing, which is connected to the mainland by the 30th Street Bridge. Sidewalks along the bridge feature viewing platforms.
== History ==
The bridge was built in 1927–1928 to replace an earlier through truss bridge aligned with 30th Street. This earlier bridge was built in 1887 but was destroyed by fire on July 8, 1921. The 1887 bridge itself replaced a two span iron truss which was destroyed by a flood in 1882. A cable suspension footbridge was provided as a crossing whilst the new 31st Street bridge was being constructed.〔(【引用サイトリンク】title=Bridges and Tunnels of Allegheny County, PA – 31st Street Bridge )
The bridge was due to close on Tuesday January 31, 2006 for a proposed $27 million refurbishment which would take two years. It eventually closed on February 14, 2006 and reopened by Mayor Luke Ravenstahl on November 21, 2007.
The portion of the bridge over the river's back channel was demolished on August 16, 2012 as part of improvements on adjacent Route 28.
The bridge was renamed in 2013, from its former name of ''Thirty-First Street Bridge, Number Six Allegheny River'' to ''William Raymond Prom Memorial Bridge'', to honor William R. Prom, who was killed in Vietnam.〔http://www.legis.state.pa.us/WU01/LI/LI/US/HTM/2013/0/0011..HTM〕〔http://wesa.fm/tags/william-raymond-prom-memorial-bridge〕〔http://pittsburgh.cbslocal.com/2013/07/22/31st-street-bridge-renamed-in-honor-of-fallen-hero/〕

File:31st Street Bridge (Pittsburgh).jpg|Bridge supports from the river.


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「31st Street Bridge」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.